Production premises of 5 000 m2 for ZAO “SEB-Vostok” (Tefal, Rowenta, Moulinex, Krups)
Client:
OOO “MLP-KAD”
Time period:
19.11.01.2009 – 16.02.2010
Works:
General design; general construction contract for reconstruction of the building; mounting of engineering systems. Post-guarantee maintenance of the building and engineering systems